Architectural Services for Buildings
New construction of daycare center Niederfüllbach - building project planning
Description: The Evang.-Luth. The whole parish of Coburg intends to build a new day care center on a church-owned property in Niederfüllbach. In advance of this award procedure, a feasibility study was carried out by the architectural firm Schultheiss from Gro?heirath, which examined the cost-effectiveness of a general renovation including conversion and expansion of the existing daycare center in comparison to a new building, and in which the space requirements and the expected construction costs were determined. The feasibility study is enclosed with the announcement. According to the current state of planning, the new day care center should accommodate 3 kindergarten groups and 2 crèche groups on an NRF of approx. 750 m2nd Offer. Planning is to be developed for the building, which is based on current and future-oriented educational concepts and meets the requirements of inclusion and all-day care for children. The Evang.-Luth. The whole parish of Coburg on the ecological preparation (here timber construction), the biological harmlessness of the building materials and the economic operation of the facility. For this, u. a. to consider effective economic work processes and procedures and energy requirements. In addition, continuous accessibility of the development and buildings should be demonstrated. The measure is funded by the Free State of Bavaria. The subject of the order is the services of the building planning according to HOAI part 3, section 1, service phases 1-9 for the new building. The assignment takes place gradually according to § 33 HOAI. When an order is placed, service phases 1 and 2 are assigned as the first stage. In the further course of the procedure, the client decides on a further commissioning of the performance levels. No demands for the transfer of further performance levels or further services can be derived from the gradual commissioning. According to the current state of knowledge, the client classifies the building project planning in fee zone III. The overall church congregation has set the expected construction costs (Kgr. 300 400, net) of EUR 1.7 million as the upper limit for construction costs. Exceeding the construction cost ceiling requires a new decision. Planning starts immediately after the order is placed in summer 2020. The construction work is to begin in mid-2021. Construction is scheduled to be completed by the end of 2022.
Time limit for receipt of tenders or requests to participate: Date: 20/05/2020 Local time: 10:00
掃一掃,,加微信
?掃一掃,,關(guān)注公眾號