Planning of construction pit / construction pit construction as well as planning of building site clearance and services for geotechnical engineering - new building in the historical center of Cologne
Engineering Services
Planning of construction pit / construction pit construction as well as planning of building site clearance and services for geotechnical engineering - new building in the historical center of Cologne
Description: In the immediate vicinity of the Cologne Cathedral (UNESCO World Heritage Site), a new ensemble consisting of the Curia House of the Cologne Cathedral and Cologne City Museum (KSM) and study buildings for the Roman-Germanic Museum (with annex to the existing building) of the city of Cologne are planned to replace existing buildings. The tendering procedure advertised here is intended to find a joint service provider for the measures of the city and the High Cathedral for the planning / consulting services mentioned below. The order is made separately by the Hohe Domkirche and the city of Cologne; it is planned to merge the two builders in a builders' community. Orders of magnitude (approximate):1. Gross floor area GFA new building: 19,380 sqm (city museum and study building 15,410 sqm / Kurienhaus 3,970 sqm);2nd basement: 2 or 3 (OK floor to -10.4 m);3. Scope of construction pit: 280 m;4. Foundation area (GRF): 3 490 sqm (2 881/609 sqm);5th demolition: a total of 16 300 cbm;6. Construction costs (KGr 200-600) as cost target (indexing until the planned award): EUR 81.3 million gross (city museum / study building: EUR 64.7 million, Kurienhaus: EUR 16.6 million), in cost group 310: 2 EUR 15 million gross. The intended assignment comprises the following service areas (see also contract / service profile):A. Planning of construction pit / shoring: Services according to HOAI §43 (project planning of engineering structures) and §51 (structural engineering): basic services service phases 1-9 (§43) or 1-6 (§51), if necessary, as well as selected special services LPh 2 -9.All the planning services required for the temporary / permanent installation to secure the excavation pit and neighboring buildings should be provided, taking into account supply / disposal lines / infrastructure facilities (subway). The use of synergies to found new buildings is expressly desired.B. Planning of building site clearance: Services based on AHO booklet no. 18 Building site clearance / dismantling (as of 10/2014), basic services, service levels 1-4, if necessary, as well as selected special services.The Curia House, built as a solitary building in 1959-62, is scheduled for demolition. In the construction site and in the immediate vicinity there can be found ground monuments and supply routes for neighboring houses. This means that the plans have to be compared with the clients and other parties involved. In level 1, the basic services include the determination of used building materials / building pollutants and the establishment of a pollutant register. Taking the boundary conditions into account, an economical, logistically clear and minimally invasive solution must be presented in the planning concept.Cable routing is required in the street Am Hof, which is carried out by Rheinenergie AG.C. Geotechnical report / building site survey: Services based on HOAI Section 1.3: Basic services, performance level a) Basic determination and exploration concept, b) Description of the subsoil and groundwater conditions and c) Assessment of the subsoil and groundwater conditions, recommendations, information, information on the design of the foundation , as well as selected special services.As part of the application process, information / evidence must be provided for performance area A - construction pit / shoring planning. The specialist planners / consultants for service areas B and C are only to be named in the second stage of the procedure - in the case of an invitation to negotiate. Service areas A, B and C are part of the fee inquiry in level 2.The client reserves the right to abolish the procedure if a fixed total fee limit of EUR 620,000 net is exceeded for both sub-projects. Fee offers are only to be submitted in the second stage - after being asked to submit an offer.Estimated time frame:1st order: 10/2020;2. Realization demolition / construction pit: 2024 to 03/2025;3. Project completion: afterwards.
Planning of construction pit / construction pit construction as well as planning of building site clearance and services for geotechnical engineering - new building in the historical center of Cologne
Time limit for receipt of tenders or requests to participate: Date: 09/06/2020 Local time: 14:00